6 structured test claims and 9 other claims whose own text says cryo, proof, static fire, spin prime, wet dress, thrust sim or burst. TEST rows are ledger test effects; MENTION rows are notes or moves that name a test and are not counted as one. The plate on each vehicle reads test claims over all rows. Read each claim and its sources before drawing a campaign count.
-
B1/5
Booster 23 B23
1 test claim and 4 mentions, newest first.
2026-10-15 TEST cryo cryo B23 at MAS
Booster 23 underwent its first cryogenic proof test at Massey's.
at MAS
@Blobifie @FelixSchlang @NASASpaceflight @StarshipGazer @Blobifie @VickiCocks15
2026-10-13 MENTION transport B23 from MB1 to MAS
Booster 23 rolled from the production site to Massey's for its initial cryo proof testing.
2026-10-12 MENTION lift B23 to MB1
Booster 23 lifted onto the booster cryo / thrust sim stand.
2026-10-09 MENTION UNCONFIRMED assign B23 as booster on F16
Assign Booster 23 as the booster on Flight 16. NSF names B23 with S43 for the first LC-39A Starship flight; on 15 Oct NSF again tied B23 cryo at Massey's to Flight 16.
2026-09-25 MENTION note about B23
Booster 23 CH4 tank stack was stacked on top of its aft section, completing major construction; outfitting comes next, ahead of cryo proof.
-
B0/1
Booster 22 B22
0 test claims and 1 mention, newest first.
2026-10-09 MENTION UNCONFIRMED note at MB1 about B22
Booster 22 is still in Mega Bay 1 as of the 9 Oct NSF report, pending static fire readiness.
at MB1
-
B0/1
Booster 21 B21
0 test claims and 1 mention, newest first.
2026-09-24 MENTION UNCONFIRMED note about B21
Flight 14 wet dress rehearsal completed: a full count with propellant fill and deluge firing, no Raptor ignition. The rehearsal was announced on 22 Sep.
-
S1/1
-
S3/5
Ship 42 S42
3 test claims and 2 mentions, newest first.
2026-10-09 TEST cryo cryo S42 at MAS
Ship 42 frosted on both tanks during cryo testing.
at MAS
2026-10-09 MENTION UNCONFIRMED note at MAS about S42
Reported by 9 Oct: SpaceX removed all six engines from S42 and rolled it to Massey's for a third time, onto the ship cryo-proof stand. NSF says this work needs thrust ram testing, not just a cryo proof, before a static fire.
at MAS
2026-10-09 MENTION transport S42 from MB2 to MAS
Ship 42 rolled to Massey's on the ship cryo stand after all 6 engines were removed.
2026-09-12 TEST other other S42 at P2
Ship catch rehearsal at Pad 2: S42 was lifted to catch height and back down to SQD height, the SQD rotated in and connected, then S42 was rotated, flaps tucked, and lowered onto its transport stand.
at P2
2026-09-10 TEST other other S42 at P2
Ship catch rehearsal at Pad 2: S42 was placed deep in the chopsticks and lifted a few meters, then the chopstick pushers moved it to the stabilizer engagement position and the stabilizers were engaged.
at P2
-
S0/1
Ship 41 S41
0 test claims and 1 mention, newest first.
2026-09-25 MENTION UNCONFIRMED note about S41
Flight 14 pad flow: after the wet dress rehearsal, Ship 41 was destacked from Booster 21 for one last quick checkout.
-
B1/1
Booster landing tank test article BLT-TA
1 test claim and 0 mentions, newest first.
2026-10-06 TEST cryo UNCONFIRMED cryo BLT-TA at MAS
Booster landing tank test article appeared to burst near its base during a cryo test, spilling liquid nitrogen. Intentional or not is unconfirmed.