45-day build lanes
Strips
One lane for each vehicle with a move, test, note or assign dated from 5 Sept to 19 Oct, the 45 days through the ledger stamp. The band is the confirmed whole-vehicle place: a whole-vehicle move or a sourced identify the fold applied. A section move does not move the band. A test does not place the vehicle. An unconfirmed claim is a hollow mark and does not paint the band. A stretch with no stated place is UNKNOWN.
- Move
- Test
- Note
- Assign
- Hollow is unconfirmed
B21 Booster 21
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-09-21 | note | none | Flight 14 pad flow: Booster 21 rolled to the pad and was stacked the same day. The post does not name the pad. | UNCONFIRMED |
| 2026-09-24 | note | none | Flight 14 wet dress rehearsal completed: a full count with propellant fill and deluge firing, no Raptor ignition. The rehearsal was announced on 22 Sep. | UNCONFIRMED |
| 2026-09-26 | note | none | FAA launch licence for Flight 14 arrived on Saturday 26 Sep, after airspace and marine notices for ascent, the Hawaii return and the planned return off Chile through the week. TrackingTheSB says the licence removed the lightning rule. | UNCONFIRMED |
| 2026-09-28 | assign | none | Assign Booster 21 as the booster on Flight 14. | confirmed |
| 2026-09-28 | note | none | On Flight 14, Booster 21 lost one Raptor on ascent, completed its flight, and splashed down in the Gulf rather than being caught. | confirmed |
B22 Booster 22
F15 UNCONFIRMED
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | assign | none | Assign Booster 22 as the booster on Flight 15. NSF says Flight 15 is currently set to use S42 and B22. | UNCONFIRMED |
| 2026-10-09 | note | MB1 | Booster 22 is still in Mega Bay 1 as of the 9 Oct NSF report, pending static fire readiness. | UNCONFIRMED |
| 2026-10-16 | note | none | Seen on a flyover: Booster 22 was waiting to roll out for pre-flight static fire testing. | UNCONFIRMED |
| 2026-10-19 | note | none | The OLM work platform has been removed from the OLM ahead of Booster 22's static fire campaign. The post does not name the pad. | UNCONFIRMED |
B23 Booster 23
F16 UNCONFIRMED
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-09-08 | move | MB1 | Booster 23 AX:2 section rolled across from Starfactory into Mega Bay 1, before its landing tank had been seen. | confirmed |
| 2026-09-09 | move | MB1 | Booster 23 F2:4 section rolled into Mega Bay 1, the start of its CH4 tank. | confirmed |
| 2026-09-20 | note | none | Reported 20 Sep 2026: Booster 23 received its integrated hot stage ring and forward dome section, the second step in stacking its CH4 tank after F2. | confirmed |
| 2026-09-21 | note | none | Booster 23 received its F3:4 section, completing the liquid methane tank section. The post does not name the bay. | confirmed |
| 2026-09-25 | note | none | Booster 23 CH4 tank stack was stacked on top of its aft section, completing major construction; outfitting comes next, ahead of cryo proof. | confirmed |
| 2026-10-09 | assign | none | Assign Booster 23 as the booster on Flight 16. NSF names B23 with S43 for the first LC-39A Starship flight; on 15 Oct NSF again tied B23 cryo at Massey's to Flight 16. | UNCONFIRMED |
| 2026-10-12 | move | MB1 | Booster 23 lifted onto the booster cryo / thrust sim stand. | confirmed |
| 2026-10-13 | move | MAS | Booster 23 rolled from the production site to Massey's for its initial cryo proof testing. | confirmed |
| 2026-10-15 | test | MAS | Booster 23 underwent its first cryogenic proof test at Massey's. | confirmed |
| 2026-10-15 | note | MAS | Aerial view shows Booster 23 at Massey's. | UNCONFIRMED |
| 2026-10-18 | move | MB1 | Booster 23 left Massey's after completing cryogenic proof testing and is headed back to the production site on Highway 4. | confirmed |
| 2026-10-18 | note | MB1 | NSF (18 Oct): Booster 23's cryo testing at Massey's concluded over the weekend with a Sunday morning trip back to Mega Bay 1 for engine installation. | UNCONFIRMED |
| 2026-10-18 | note | none | TrackingTheSB weekly: Booster 23 completed only one cryogenic proof test at Massey's before rolling back to the production site. Every previous booster apart from BN3 in 2021 did at least two; the cause of the early end is not known. | confirmed |
B24 Booster 24
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-09-27 | move | MB1 | Reported 27 Sep 2026: Booster 24 began construction in the week of 21 Sep, with its A2:4 section rolling into Mega Bay 1. | confirmed |
| 2026-10-02 | move | MB1 | Booster 24 A5:4 rolled from Starfactory to Mega Bay 1. Initially misidentified as A6. | confirmed |
| 2026-10-07 | move | MB1 | Booster 24 A6:4 rolled from Starfactory to Mega Bay 1. | confirmed |
| 2026-10-07 | move | MB1 | Booster 24 methane landing tank and lower transfer tube rolled from Starfactory to Mega Bay 1. | confirmed |
| 2026-10-08 | move | MB1 | Booster 24 full transfer tube rolled into Mega Bay 1. | confirmed |
| 2026-10-14 | move | MB1 | Booster 24 LOX landing tank took a long route from Starfactory into Mega Bay 1 for installation. | confirmed |
| 2026-10-16 | note | none | Seen on a flyover: Booster 24 was getting its LOX landing tank installed, with Booster 22 behind it. The post does not name the building. | UNCONFIRMED |
| 2026-10-18 | note | MB1 | TrackingTheSB weekly: in Mega Bay 1, Booster 24 received its final aft section (AX:2) and its landing tank, completing the lower half of the booster that makes up the LOX tank. CH4 tank stacking and mating the two halves come next. | confirmed |
S39.1 S39.1
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-04 | move | MAS | S39.1 rolled from the production site back to Massey's. Reason unclear. | confirmed |
S40 Ship 40
F13 UNCONFIRMED
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-07 | move | PoB | S40, the Flight 13 ship, arrived at the Port of Brownsville on the morning of 7 Oct after 75 days at sea. | UNCONFIRMED |
| 2026-10-07 | move | PoB | Ship 40 arrived at the Port of Brownsville aboard Forte, 75 days after its Indian Ocean splashdown. | confirmed |
| 2026-10-10 | move | SAN | Ship 40 offloaded from Forte and rolled overnight from the Port of Brownsville to the production site. | confirmed |
| 2026-10-12 | move | MB2 | Ship 40 broken over and lifted vertical inside Mega Bay 2, its first tip-up since recovery, using two cranes and the SHT-SAF. | confirmed |
| 2026-10-13 | note | none | SpaceX: S40, the first Starship to return to its launch site, is vertical alongside three other ships in a Mega Bay at Starbase and will give first-of-its-kind data on a flown heatshield, Raptor engines and avionics. The post does not name the bay. | confirmed |
| 2026-10-15 | note | MB2 | NSF Starbase summary: S40 now stands inside Mega Bay 2 with three future flight vehicles, naming the bay SpaceX left unnamed on 13 Oct. NSF footage shows a hexagonal breakover frame pinned to the base of S40 so it pivoted on rollers as the front bridge crane raised it. | UNCONFIRMED |
| 2026-10-18 | note | MB2 | TrackingTheSB weekly: after its tip-up, Ship 40 was moved into Mega Bay 2 and placed onto one of the work stands in the building. The post says SpaceX's plans for it are unknown, and whether it goes on display or is scrapped is not known. | confirmed |
S41 Ship 41
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-09-22 | note | none | Flight 14 pad flow: Ship 41, the first orbital ship, followed Booster 21 to the pad a day later. The post does not name the pad. | UNCONFIRMED |
| 2026-09-25 | note | none | Flight 14 pad flow: after the wet dress rehearsal, Ship 41 was destacked from Booster 21 for one last quick checkout. | UNCONFIRMED |
| 2026-09-26 | note | none | Flight 14 pad flow: Ship 41 was restacked on Booster 21. | UNCONFIRMED |
| 2026-09-28 | assign | none | Assign Ship 41 as the ship on Flight 14. | confirmed |
| 2026-09-28 | note | none | Flight 14 was the first orbital Starship flight and the first to deliver payload to orbit: 26 Starlink V3 satellites. Ship 41 entered orbit, deployed the satellites, deorbited, and splashed down in the Pacific Ocean. | confirmed |
S42 Ship 42
F15 UNCONFIRMED
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-09-10 | test | P2 | Ship catch rehearsal at Pad 2: S42 was placed deep in the chopsticks and lifted a few meters, then the chopstick pushers moved it to the stabilizer engagement position and the stabilizers were engaged. | confirmed |
| 2026-09-12 | test | P2 | Ship catch rehearsal at Pad 2: S42 was lifted to catch height and back down to SQD height, the SQD rotated in and connected, then S42 was rotated, flaps tucked, and lowered onto its transport stand. | confirmed |
| 2026-10-09 | note | MAS | Reported by 9 Oct: SpaceX removed all six engines from S42 and rolled it to Massey's for a third time, onto the ship cryo-proof stand. NSF says this work needs thrust ram testing, not just a cryo proof, before a static fire. | UNCONFIRMED |
| 2026-10-09 | move | MAS | Ship 42 rolled to Massey's on the ship cryo stand after all 6 engines were removed. | confirmed |
| 2026-10-09 | test | MAS | Ship 42 frosted on both tanks during cryo testing. | confirmed |
| 2026-10-09 | assign | none | Assign Ship 42 as the ship on Flight 15. NSF says Flight 15 is currently set to use S42 and B22. | UNCONFIRMED |
| 2026-10-10 | move | MB2 | Ship 42 returned to Mega Bay 2 after its third round of testing at Massey's. | confirmed |
| 2026-10-18 | note | MB2 | TrackingTheSB weekly: inside Mega Bay 2, Ship 42 has engines installed again ahead of its static fire campaign for Flight 15, after all of its engines were removed following Flight 14. The post says the reason for the removal is not known. | confirmed |
S43 Ship 43
F16 UNCONFIRMED
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | note | MB2 | Ship 43 is inside Mega Bay 2 finishing internals and is still missing its starboard-side aft flap. NSF says it was fully stacked on 15 Sep 2026. | UNCONFIRMED |
| 2026-10-09 | assign | none | Assign Ship 43 as the ship on Flight 16. NSF names S43 with B23 for the first LC-39A Starship flight (Starlink Group 30-1). | UNCONFIRMED |
S43.1 S43.1
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-13 | test | MAS | S43.1 tested inside the Supercrusher at Massey's overnight. | confirmed |
| 2026-10-15 | note | MAS | S43.1 nosecone tip appears slightly crumpled during testing at Massey's. When that happened and how it affects remaining tests is unclear. | UNCONFIRMED |
| 2026-10-18 | note | MAS | TrackingTheSB weekly: S43.1 is a ship nosecone and header tank test article. It shows visible buckling around the nosecone tip, which the post says likely happened during a test on 14 Oct, with sensors placed around the buckled area. | UNCONFIRMED |
S44 Ship 44
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-09-27 | move | MB2 | Reported 27 Sep 2026: Ship 44 began main body assembly in the week of 21 Sep, with the N:3 and FX:4 rolling into Mega Bay 2. | confirmed |
| 2026-10-05 | move | MB2 | Ship 44 A2:4 rolled into Mega Bay 2. | confirmed |
| 2026-10-09 | note | MB2 | Ship 44 is on the Mega Bay 2 turntable and is missing only its transfer tubes and drive/engine section; the transfer tubes are sitting in Starfactory. | UNCONFIRMED |
| 2026-10-16 | note | MB2 | The transfer tube jig, loaded with tubes for Ship 44, moved from Starfactory into Mega Bay 2. | confirmed |
| 2026-10-17 | note | none | S44 has gained its transfer tubes. | UNCONFIRMED |
| 2026-10-17 | note | MB2 | S44, with decals applied and transfer tubes installed or being installed, sits front and centre in Mega Bay 2 awaiting a lift to a work stand for further work. | UNCONFIRMED |
| 2026-10-17 | note | none | Ship 44 was lifted onto the transfer tube install jig. | UNCONFIRMED |
| 2026-10-18 | note | MB2 | Ship 44, now fitted with its transfer tubes, was lifted clear of the transfer tube jig and moved to a work stand inside Mega Bay 2, and the jig went back to Starfactory. | UNCONFIRMED |
S45 Ship 45
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | note | SFC | NSF reports Ship 45 nose cone stacked on its payload bay at Starfactory, waiting for Ship 44 to finish stacking before S45 leaves the Starfactory turntable. | UNCONFIRMED |
BLT-TA Booster landing tank test article
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-06 | test | MAS | Booster landing tank test article appeared to burst near its base during a cryo test, spilling liquid nitrogen. Intentional or not is unconfirmed. | UNCONFIRMED |