2026-W41
5 Oct 2026 to 11 Oct 2026
37 claims: 18 CONFIRMED, 19 UNCONFIRMED
Grouped by the site stated in the claim; moves use their destination. No site means no site was stated. A claim naming several vehicles or hardware items appears once under a combined group.
sfc Starfactory
S45
note UNCONFIRMED
NSF reports Ship 45 nose cone stacked on its payload bay at Starfactory, waiting for Ship 44 to finish stacking before S45 leaves the Starfactory turntable.
identify UNCONFIRMED
Identify Ship 45. NSF reports its nose cone is stacked on its payload bay at Starfactory.
mb1 Mega Bay 1
B22
note UNCONFIRMED
Booster 22 is still in Mega Bay 1 as of the 9 Oct NSF report, pending static fire readiness.
B24
move CONFIRMED
Booster 24 full transfer tube rolled into Mega Bay 1.
move CONFIRMED
Booster 24 methane landing tank and lower transfer tube rolled from Starfactory to Mega Bay 1.
move CONFIRMED
Booster 24 A6:4 rolled from Starfactory to Mega Bay 1.
mb2 Mega Bay 2
S42
move CONFIRMED
Ship 42 returned to Mega Bay 2 after its third round of testing at Massey's.
S43
note UNCONFIRMED
Ship 43 is inside Mega Bay 2 finishing internals and is still missing its starboard-side aft flap. NSF says it was fully stacked on 15 Sep 2026.
S44
note UNCONFIRMED
Ship 44 is on the Mega Bay 2 turntable and is missing only its transfer tubes and drive/engine section; the transfer tubes are sitting in Starfactory.
move CONFIRMED
Ship 44 A2:4 rolled into Mega Bay 2.
gigabay-tx Gigabay (Starbase)
gigabay-bridge-crane
note CONFIRMED
Gigabay large bridge crane received its working load limit sign: 420.
sanchez Sanchez lot
pad1-flame-deflector
note CONFIRMED
Pad 1 flame deflector under construction in the Sanchez lot; TrackingTheSB says work on it continued steadily through the week of 5 Oct.
pad1-olm
note CONFIRMED
New Pad 1 orbital launch mount under construction in the Sanchez lot; TrackingTheSB says work on it continued steadily through the week of 5 Oct.
pad1-sqd
note CONFIRMED
Pad 1 SQD arm under construction in the Sanchez lot; TrackingTheSB says work on it continued steadily through the week of 5 Oct.
S40
move CONFIRMED
Ship 40 offloaded from Forte and rolled overnight from the Port of Brownsville to the production site.
masseys Massey's test site
og-can-crusher
move CONFIRMED
The original can crusher moved to Massey's.
BLT-TA
test UNCONFIRMED
Booster landing tank test article appeared to burst near its base during a cryo test, spilling liquid nitrogen. Intentional or not is unconfirmed.
S42
test CONFIRMED
Ship 42 frosted on both tanks during cryo testing.
move CONFIRMED
Ship 42 rolled to Massey's on the ship cryo stand after all 6 engines were removed.
note UNCONFIRMED
Reported by 9 Oct: SpaceX removed all six engines from S42 and rolled it to Massey's for a third time, onto the ship cryo-proof stand. NSF says this work needs thrust ram testing, not just a cryo proof, before a static fire.
pad2 Starbase Pad 2
Site and other claims
schedule UNCONFIRMED
CADENA advisory: Flight 15 from Starbase Pad 2 NET 8 Nov 2026; Flight 16 (Starlink 30-1), potentially LC-39A, NET 10 Dec 2026.
port-bro Port of Brownsville
S40
move CONFIRMED
Ship 40 arrived at the Port of Brownsville aboard Forte, 75 days after its Indian Ocean splashdown.
move UNCONFIRMED
S40, the Flight 13 ship, arrived at the Port of Brownsville on the morning of 7 Oct after 75 days at sea.
lc39a LC-39A
Site and other claims
schedule UNCONFIRMED
CADENA advisory: Flight 15 from Starbase Pad 2 NET 8 Nov 2026; Flight 16 (Starlink 30-1), potentially LC-39A, NET 10 Dec 2026.
mcgregor-raptor McGregor test site
mcgregor-raptor-north
note UNCONFIRMED
Raptor North Stand at the McGregor test site; NSF reported a 557-second Raptor firing there.
Site and other claims
note UNCONFIRMED
NASASpaceflight: a Raptor fired for 557 seconds on the Raptor North Stand at McGregor, the second-longest firing on record and the longest that was not a run to failure.
No site
gigabay-bridge-crane
identify CONFIRMED
Gigabay large bridge crane received its working load limit sign: 420.
mcgregor-raptor-north
identify UNCONFIRMED
Identify the Raptor North Stand at McGregor as hardware; NSF reported a 557-second Raptor firing on that stand.
og-can-crusher
identify CONFIRMED
The original can crusher moved to Massey's.
pad1-flame-deflector
identify CONFIRMED
Identify the new Pad 1 flame deflector as hardware, under construction in the Sanchez lot alongside the new Pad 1 OLM and SQD arm.
pad1-sqd
identify CONFIRMED
Identify the new Pad 1 ship quick disconnect (SQD) arm as hardware, under construction in the Sanchez lot.
B22
assign UNCONFIRMED
Assign Booster 22 as the booster on Flight 15. NSF says Flight 15 is currently set to use S42 and B22.
identify UNCONFIRMED
Identify Booster 22 as the Super Heavy NSF names for Starship Flight 15.
B23
assign UNCONFIRMED
Assign Booster 23 as the booster on Flight 16. NSF names B23 with S43 for the first LC-39A Starship flight; on 15 Oct NSF again tied B23 cryo at Massey's to Flight 16.
S42
assign UNCONFIRMED
Assign Ship 42 as the ship on Flight 15. NSF says Flight 15 is currently set to use S42 and B22.
S43
assign UNCONFIRMED
Assign Ship 43 as the ship on Flight 16. NSF names S43 with B23 for the first LC-39A Starship flight (Starlink Group 30-1).
Site and other claims
note UNCONFIRMED
At the X Takeover on 10 Oct 2026, Elon Musk said four to six weeks is about right for Flight 15, that it probably launches a little bit before Thanksgiving, and that SpaceX will try to catch the ship for the first time. SpaceX has not announced a Flight 15 date.